Project Name Client Inspection Items Period of Inspection
 TECO POLK 2 PROJECT BLACK & BEATCH / D&C HRSG 2014. 04 ~ PRESENT
 CANE RUN 7 NGCC PROJECT BLACK & BEATCH / D&C HRSG 2013. 05 ~ 2013. 11
 SK V-PROJECT, PKG II SK INNOVATION/ HYUNDAI E & C PRESSURE VESSEL, HEAT EXCHANGER, COLUMN, STEEL STRUCTURE, BOILER, HEATER, REFORMER, BULK MATERIAL ELECTRICAL EQUIPMENT AND INSTRUMENT AND ETC. 2013. 02 ~ 2014. 05
 KALTIM-5 PROJECT TOYO ENGINEERING HEAT EXCANGERS, REACTORS, PRESSURE VESSELS 2012. 07 ~ 2013. 08
 BARZAN ONSHORE PROJECT JGC CORP. HEAT RECOVERY STEAM GENERATORS, CS DRUM, FILTERS, CLAUS REACTORS, BULK MATERIAL 2012. 05 ~ 2013. 02
 SADARA ISOCYANATES PROJECT DAELIM INDUSTRIAL PHOSGENATION REACTORS 2012. 05 ~ PRESENT
 CHANA CCP BLOCK2 PROJECT WANG NOI CCP BLOCK4 PROJECT BLACK & BEATCH / D&C DRUM, MODULE BOX 2011. 12 ~ 2012. 12
 UAE SHAH GAS DEVELOPMENT PKG#4 UTILITIES & OFFSITES PROJECT SAMSUNG ENGINEERING PRESSURE VESSEL, HEAT EXCHANGER, COLUMN, STEEL STRUCTURE, BULK MATERIAL ELECTRICAL EQUIPMENT AND INSTRUMENT AND ETC. 2010. 8 ~ 2014. 02
 PETROTRIN ULSD PROJECT SAMSUNG ENGINEERING HEATER, HEAT EXCHANGER, COLUMN, BULK MATERIAL ELECTRICAL EQUIPMENT AND INSTRUMENT AND ETC. 2010. 12 ~ 2013. 03
 FERTIL-2 AMMONIA/UREA EXPANSION PROJECT SAMSUNG ENGINEERING PRESSURE VESSEL, COLUMN, BULK MATERIAL, ELECTRICAL EQUIPMENT AND INSTRUMENT AND ETC. 2010. 6 ~ 2011. 11
<< 1 2 3 4 5 6 7 8 9 10 >>
         

 

Tel : 02-706-3642(대표), Fax : 02-706-3644

서울 금천구 가산디지털 1로 205, KCC웰츠밸리 1006호 (주)글로벌검정

Copyright 2014 Global Inspection Sevices Co., Ltd. All rights Reserved